WHITESTONE DOME GLASS INSTALLATION & USER MANUAL Pdf Download (2024)

  1. Manuals
  2. Brands
  3. Whitestone Manuals
  4. Protection Device
  5. DOME GLASS

Hide thumbs Also See for DOME GLASS:

  • User manual (15 pages)
  • ,
  • (7 pages)
  • ,
  • User manual (14 pages)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
  • Bookmarks

Advertisem*nt

Quick Links

Download this manual

DOME GLASS

®

Seesaw Installation User Guide

(EN)

User Guide

Ultrasonic Fingerprint Model

• Please check all manual and attachment videos before using the product.

• Products damaged or damaged by user negligence cannot be exchanged or refunded.

NextPage
  • 1
  • 2
  • 3
  • 4
  • 5

Advertisem*nt

WHITESTONE DOME GLASS INSTALLATION & USER MANUAL Pdf Download (1)

Related Manuals for Whitestone DOME GLASS

  • Cell Phone Accessories Whitestone DOME GLASS User Manual

    Premium film installation galaxy z fold 3/4 (15 pages)

  • Cell Phone Accessories Whitestone DOME GLASS User Manual

    Premium film installation galaxy z flip 3/4 (14 pages)

  • Cell Phone Accessories Whitestone DOME GLASS User Manual

    Uv gen film installation galaxy s22 ultra/note 20 ultra (9 pages)

  • Cell Phone Accessories Whitestone DOME GLASS User Manual

    For galaxy z fold 3 / 4 (7 pages)

  • Premium film for galaxy s22 5g / s22+ 5g (7 pages)

Summary of Contents for Whitestone DOME GLASS

  • Page 1 DOME GLASS ® Seesaw Installation User Guide (EN) User Guide Ultrasonic Fingerprint Model • Please check all manual and attachment videos before using the product. • Products damaged or damaged by user negligence cannot be exchanged or refunded.
  • Page 2 • Please see all introductions, since each device has different installation way. • Install the Dome glass after removing any film on the screen. • Must check if the installation spot is flat using a level meter or an app.
  • Page 3 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Components Reference • There may be differences in components depending on the model. UV Curing Machine • To improve the product, component's appearance or specifications etc. can be change without prior notice. Not included in the replacement kit.
  • Page 4 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP1 Attach the connector masking films to the any buttons or holes located on the [Figure1] top/bottom/right/left sides. Make sure to cover hole or button thoroughly with connect masking film. Wipe the whole screen with alcohol wipes and cleaning clothes. Insert device firmly into the bottom jig by pushing down on all four sides of your device.
  • Page 5 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP1 [Figure 1] Close it with the top jig. [Figure 2] After placing absorption pads on the both side in the top. [Figure 3] Please remove all dust with the dust removal sticker provided. •...
  • Page 6 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP2 [Figure 1] Insert the pin in the hole in the top part of top jig. [Figure 1]...
  • Page 7 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP3 [Figure 1] Place the black position bridge at the top og the jig. [Figure 1]...
  • Page 8 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP4 [Figure 1] Open the color cap of the adhesive bottle and completely insert into the position bridge. [Figure 2] Then, open the black cap to release liquid and wait 30 secs. [Figure 3] After all the adhesive is poured out, hold the center of the jig lightly and remove the adhesive bottle and the position bridge together.
  • Page 9 (Ultrasonic Fingerprint Model) Installation STEP5 [Figure 1] After removing the liner film of the Dome glass, place the glass into the bottom part of the jig. [Figure 2] Place tempered glass diagonally on bottom of jig and pin. [Figure 3] Check the liquid guide direction as shown in image. Hold the handle sticker and place the protrusion of the liquid guide in the groove of the jig.
  • Page 10: Installation

    Make sure the adhesive is completely spread out to the edge. • Do not touch or move the jig or the Dome glass while the adhesive spreads. • Please proceed with curing after confirming that the adhesive is completely spread.
  • Page 11 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP7 Once the glass is successfully attached, use the UV light included to initially cure your device for 15 seconds each on the bottom half and top half of the screen. Take out the device from the jig and remove all the connector masking films. Wipe any liquid adhesive from the edges of the screen with alcohol wipes.
  • Page 12 Seesaw Installation Guide (Ultrasonic Fingerprint Model) Installation STEP8 After placing the wiped clean device on the floor, use the UV light for the secondary curing process for 60 seconds for the bottom part and 60 seconds for the top part. Repeat this and cure for 1 more minute on both the top and the bottom.
  • Page 13 Precautions after installation • Dome glass may be damaged by impacts or external strength. • Although Dome glass includes shatter-resistant film, recommend users change the Dome glass to new one once glass is broken in order to prevent any harm.
  • Page 14 The unique Component Manufacturer, Whitestone (www.whitestonedome.com) for Mobile Device. Copyright ⓒ 2021 Whitestone Ltd. All rights reserved.
WHITESTONE DOME GLASS INSTALLATION & USER MANUAL Pdf Download (2024)
Top Articles
Latest Posts
Article information

Author: Tyson Zemlak

Last Updated:

Views: 6409

Rating: 4.2 / 5 (63 voted)

Reviews: 94% of readers found this page helpful

Author information

Name: Tyson Zemlak

Birthday: 1992-03-17

Address: Apt. 662 96191 Quigley Dam, Kubview, MA 42013

Phone: +441678032891

Job: Community-Services Orchestrator

Hobby: Coffee roasting, Calligraphy, Metalworking, Fashion, Vehicle restoration, Shopping, Photography

Introduction: My name is Tyson Zemlak, I am a excited, light, sparkling, super, open, fair, magnificent person who loves writing and wants to share my knowledge and understanding with you.